Welcome

Plan your home
budget with MET

A focused intake to set the right financial baseline before your first design conversation. About 5 minutes, ~14 questions, plain language.

01
Quick. Five minutes, fourteen questions.
02
Plain English. No construction jargon required.
03
Honest. Calibrated to MET-class Metro Manila residential rates, 2026.
04
Yours. Download a PDF or hand the data file to MET to start your project.
About You

First, your details

We'll send you a copy of the estimate at the end. We won't spam.

Your information is used only to send your estimate. You choose whether to share it with MET afterwards.

Location

Where are you building?

For local labor and material calibration.

Size

How big a home?

A rough sense of living space.

01Bungalow
02Two-storey
03Three-storey
300sqm
Compact ↔ Estate

Your architect will refine this number — a rough sense is enough now.

Bedrooms

How many bedrooms?

Including the master suite — the first one is assumed to be the master.

3

Most MET-class homes have 3–5 bedrooms.

Bathrooms

How many bathrooms?

Full bathrooms with shower, and powder rooms with just WC + lavatory.

Full baths
3
Powder rooms
1

Typical: one full bath per bedroom, plus one powder room near the living areas.

Common Spaces

Living, dining & kitchen

The heart of the home. Match these to how you actually entertain.

S~20 sqm · cozy
M~28 sqm · standard
L~40 sqm · grand
SBasic modular
MMid custom · solid surface
HItalian-class · stone
Additional Rooms

Anything else?

Beyond bedrooms, baths, and common areas. Pick all that apply.

Service

Staff quarters

Common in PH residential. Each includes an integrated T&B.

Maid's quarters
1
Driver's quarters
1
Outdoor

Garage & outdoor spaces

Vehicles, lanai, garden.

2
—None
S12 sqm
M20 sqm
L32 sqm
Site

Tell us about the lot

For sitework, fence, and driveway calculations.

500sqm
Urban ↔ Estate
Quality

Overall finish quality

The biggest single driver of total cost. You can mix-and-match later — pick the overall direction now.

Special

Special features?

Pick what you definitely want. Skip if unsure.

Total Project Budget
₱0
— to —
—

Here's your turnkey budget

All-in — including contractor overhead, contingency, fees, and VAT. Numbers below sum to the total above.

Where the money goes — turnkey breakdown
Contractor scope · turnkey + OH&P 18%——
Owner-procured materials · direct to suppliers——
Owner direct-engaged specialists · windows · cabinetry · CCTV——
Construction reserves · contingency 10% + escalation 5%——
Owner's project manager · OCM 3%——
Design + professional fees · architect, engineers 10%——
VAT · 12% on construction + fees——
Total project budget100.0%—
By construction element (direct cost basis)
A starting estimate, not a quote. Real costs depend on site conditions, design decisions, material specifications, and contractor selection. Use this to anchor your initial conversation with MET — we'll refine it as the design takes shape.
Your selections

Or download the JSON file and email it to MET — we open it directly in our detailed calculator.

Powered by the Build Quotient Parametric Cost Framework
MET Design · Manila · 2026 · Currency PHP